admin
08e9ddbd5c
gates / gates (push) Successful in 25s
docs: localisation slice 2 release B (controller v0.253.0) — R-557 progress, R-575, R-576
...
All 179 Hungarian error messages carry a key; zero remain. 10-localisation.md gains §10.2: the
four properties util.MsgError had to have at once and the failure each one prevents, and the
plural rule as a BUNDLE rule rather than a per-call-site flag, with the answerable sentence and
what the other option would have cost.
Two instrument defects recorded rather than tidied away, because both shapes recur:
R-576 — the parity gate has a measured blind spot. The bulk converter dropped the continuation
of multi-line concatenations, damaging 7 producers, and the gate stayed GREEN: every surviving
fragment WAS a byte-equal base-commit literal, so its question ("is this text real?") was
answered yes while the CALL had lost half its sentence. Two behaviour tests caught it. The
general form: a structural gate over the TEXT cannot see a defect in the CALL.
And the script counting what was left was case-sensitive, so it said "0 remain" while five did —
R-565's shape inside the measurement. Every "no Hungarian left" claim in this slice is now made
case-insensitively and with both controls.
R-575 — the soft memory-overcommit warning has no error to carry a key and no language where it
is built, so it renders Hungarian on an English page. Named in the code, not hidden.
Live evidence includes a mistake I made and corrected: a probe of the deploy refusal INSTALLED
vaultwarden on demo-hp (the endpoint accepts before it validates), the same mistake the previous
session recorded. Removed through the product's own path with its data; verified gone.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com >
Claude-Session: https://claude.ai/code/session_0159rPz1ZhFKsS53msqPYxtS
2026-09-18 11:51:06 +02:00
..
2026-08-22 05:25:30 +02:00
2026-08-23 14:12:23 +02:00
2026-08-31 12:21:52 +02:00
2026-08-23 12:03:49 +02:00
2026-08-22 13:26:10 +02:00
2026-08-22 16:33:45 +02:00
2026-08-23 00:33:12 +02:00
2026-08-22 18:40:22 +02:00
2026-08-23 07:59:52 +02:00
2026-08-31 14:39:29 +02:00
2026-09-01 06:07:13 +02:00
2026-08-20 12:54:54 +02:00
2026-09-16 20:27:25 +02:00
2026-09-15 01:05:05 +02:00
2026-09-17 12:25:52 +02:00
2026-09-17 10:13:23 +02:00
2026-09-14 18:52:09 +02:00
2026-09-16 14:27:04 +02:00
2026-09-14 16:40:59 +02:00
2026-09-01 16:55:50 +02:00
2026-08-12 17:41:56 +02:00
2026-08-20 10:42:50 +02:00
2026-08-18 06:09:38 +02:00
2026-08-18 12:26:53 +02:00
2026-09-15 11:45:21 +02:00
2026-08-13 08:19:41 +02:00
2026-08-30 18:49:53 +02:00
2026-08-30 19:39:41 +02:00
2026-09-16 21:20:51 +02:00
2026-08-09 12:35:26 +02:00
2026-09-01 21:35:32 +02:00
2026-08-31 15:59:09 +02:00
2026-08-14 07:57:07 +02:00
2026-09-17 14:58:35 +02:00
2026-09-17 18:50:16 +02:00
2026-09-18 11:51:06 +02:00
2026-09-13 21:57:47 +02:00
2026-09-13 23:06:21 +02:00
2026-09-13 10:14:37 +02:00
2026-09-06 17:42:19 +02:00
2026-09-17 21:11:31 +02:00
2026-09-01 10:36:54 +02:00
2026-09-13 09:07:08 +02:00
2026-09-13 17:54:23 +02:00
2026-09-13 12:30:17 +02:00
2026-09-06 11:48:57 +02:00
2026-09-13 19:42:42 +02:00
2026-09-13 21:57:47 +02:00
2026-09-13 23:06:21 +02:00
2026-07-02 10:43:19 +02:00
2026-09-01 12:39:45 +02:00
2026-06-30 20:13:48 +02:00
2026-07-11 21:25:14 +02:00
2026-07-23 15:48:01 +02:00
2026-07-20 09:09:25 +02:00
2026-06-15 12:39:44 +02:00
2026-09-15 01:05:05 +02:00
2026-06-13 19:28:25 +02:00
2026-07-12 06:55:40 +02:00
2026-07-14 00:45:20 +02:00
2026-07-14 10:12:21 +02:00
2026-07-14 12:17:26 +02:00
2026-07-14 12:17:26 +02:00
2026-07-14 13:32:14 +02:00
2026-07-14 13:32:14 +02:00
2026-07-14 20:01:13 +02:00
2026-07-15 19:48:43 +02:00
2026-07-15 21:11:39 +02:00
2026-07-19 03:30:50 +02:00
2026-07-28 11:32:45 +02:00
2026-07-28 19:08:25 +02:00
2026-08-02 10:11:21 +02:00
2026-08-02 08:31:51 +02:00
2026-08-06 12:18:29 +02:00
2026-08-07 23:07:42 +02:00
2026-07-06 20:43:52 +02:00
2026-07-10 04:32:32 +02:00
2026-07-02 10:27:17 +02:00
2026-07-30 16:58:06 +02:00
2026-06-13 22:32:23 +02:00
2026-07-26 08:51:45 +02:00
2026-07-26 09:59:35 +02:00
2026-08-02 20:38:21 +02:00
2026-07-24 07:49:11 +02:00
2026-07-19 13:04:58 +02:00
2026-07-19 13:04:58 +02:00
2026-07-30 08:13:58 +02:00
2026-07-20 13:40:55 +02:00
2026-08-14 07:57:07 +02:00
2026-06-23 17:15:30 +02:00
2026-07-17 10:55:17 +02:00
2026-07-13 13:21:14 +02:00
2026-09-14 18:52:09 +02:00
2026-07-04 22:53:07 +02:00
2026-09-17 09:27:10 +02:00
2026-07-03 18:38:28 +02:00
2026-07-13 15:02:44 +02:00
2026-07-12 20:43:25 +02:00
2026-09-14 16:17:47 +02:00
2026-07-03 18:38:28 +02:00
2026-09-16 14:27:04 +02:00
2026-08-04 23:18:47 +02:00
2026-08-04 18:52:14 +02:00
2026-08-12 17:45:23 +02:00
2026-07-29 23:34:06 +02:00
2026-06-29 10:32:56 +02:00
2026-07-31 08:55:53 +02:00
2026-09-17 14:50:29 +02:00
2026-08-18 12:26:53 +02:00
2026-07-20 12:09:01 +02:00
2026-08-06 11:49:22 +02:00
2026-08-06 09:38:52 +02:00
2026-08-06 11:22:34 +02:00
2026-06-14 11:00:26 +02:00
2026-06-14 15:43:07 +02:00
2026-07-30 13:28:10 +02:00
2026-07-30 14:21:44 +02:00
2026-07-30 07:15:31 +02:00
2026-07-30 09:34:08 +02:00
2026-07-30 12:42:26 +02:00
2026-07-30 10:48:16 +02:00
2026-07-23 20:46:27 +02:00
2026-08-06 12:16:38 +02:00
2026-08-04 12:16:04 +02:00
2026-09-01 10:19:55 +02:00
2026-08-09 12:35:26 +02:00
2026-08-22 10:11:46 +02:00
2026-08-21 23:30:27 +02:00
2026-08-22 12:13:54 +02:00
2026-08-13 10:50:12 +02:00
2026-08-13 16:01:45 +02:00
2026-08-22 11:18:08 +02:00
2026-07-06 20:43:52 +02:00
2026-07-01 13:52:44 +02:00
2026-07-29 23:51:17 +02:00
2026-07-03 13:00:00 +02:00
2026-06-29 15:08:58 +02:00
2026-07-05 14:45:58 +02:00
2026-09-01 21:35:32 +02:00
2026-07-14 16:39:55 +02:00
2026-07-16 11:29:03 +02:00
2026-07-26 06:59:46 +02:00
2026-08-02 16:35:34 +02:00
2026-08-03 14:00:54 +02:00
2026-06-29 23:32:12 +02:00
2026-07-13 17:15:52 +02:00
2026-06-29 19:46:17 +02:00
2026-06-28 09:03:34 +02:00
2026-06-14 18:14:08 +02:00
2026-08-05 10:27:40 +02:00
2026-07-07 19:08:03 +02:00
2026-06-16 14:18:39 +02:00
2026-07-01 21:27:48 +02:00
2026-08-20 12:54:54 +02:00
2026-07-09 09:48:57 +02:00
2026-07-05 18:18:37 +02:00
2026-07-22 11:45:55 +02:00
2026-07-22 11:45:55 +02:00
2026-07-09 17:46:43 +02:00
2026-07-16 20:00:01 +02:00
2026-06-16 10:04:55 +02:00
2026-06-15 15:26:37 +02:00
2026-07-25 14:36:56 +02:00
2026-07-18 10:50:14 +02:00
2026-06-29 19:46:17 +02:00
2026-07-11 15:43:26 +02:00
2026-06-29 11:44:40 +02:00
2026-07-11 08:20:22 +02:00
2026-08-04 12:16:04 +02:00
2026-07-05 17:01:35 +02:00
2026-07-10 20:12:26 +02:00
2026-07-15 17:53:42 +02:00
2026-07-01 13:02:16 +02:00
2026-07-27 09:36:11 +02:00
2026-09-01 13:55:35 +02:00
2026-07-30 11:49:59 +02:00
2026-08-02 23:56:16 +02:00
2026-08-03 06:34:26 +02:00
2026-08-07 08:53:16 +02:00
2026-09-06 17:42:19 +02:00
2026-06-15 10:57:33 +02:00
2026-08-02 09:07:09 +02:00
2026-07-09 14:15:01 +02:00
2026-08-31 15:59:09 +02:00
2026-07-14 21:18:36 +02:00
2026-07-25 07:56:02 +02:00
2026-06-28 19:27:07 +02:00
2026-07-09 11:05:36 +02:00
2026-07-31 13:57:21 +02:00
2026-08-13 10:50:12 +02:00
2026-07-31 15:35:07 +02:00
2026-07-31 12:12:35 +02:00
2026-09-06 11:48:57 +02:00
2026-06-14 21:15:24 +02:00
2026-06-15 21:53:10 +02:00
2026-07-31 08:27:36 +02:00
2026-06-30 10:04:59 +02:00
2026-07-09 16:31:58 +02:00
2026-07-10 09:29:22 +02:00
2026-07-09 13:17:52 +02:00
2026-07-09 22:04:44 +02:00