3e58c184f6
gates / gates (push) Successful in 27s
DRILL-night-2026-09-23.md: Parts A-E. 09 §3 decisions 21 (operator word), 22 and 23 (CC unattended, operator may reverse); §6.4 parts 4 and 6 (catalog half) shipped; §6.1a residuals R-658/R-659. Register 330 -> 336: R-651..R-660 opened (R-658 and R-659 P1), R-650/R-640/R-499/R-626 closed. Capability map, nightly rotation (opengist), STATUS (one question: the floor), CONTEXT, REPORT. The floor stays 0.266.0. Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_0159rPz1ZhFKsS53msqPYxtS