deploy: hub 0.100.1 (the side-by-side dropdown resolve rides this image)
gates / gates (push) Failing after 14m52s

This commit is contained in:
2026-08-08 17:51:29 +02:00
parent 9ce8c631d3
commit de0110b8da
2 changed files with 2 additions and 2 deletions
+1 -1
View File
@@ -1,4 +1,4 @@
## v0.100.0 — the Configuration page took 26 seconds, and it was never hashing anything (2026-08-08)
## v0.100.1 — the Configuration page took 26 seconds, and it was never hashing anything (2026-08-08)
**Measured, not guessed:** `GET /configuration`**HTTP 200 in 26.2 s**.
+1 -1
View File
@@ -125,7 +125,7 @@ spec:
spec:
containers:
- name: hub
image: gitea.dooplex.hu/admin/felhom-hub:0.100.0
image: gitea.dooplex.hu/admin/felhom-hub:0.100.1
ports:
- containerPort: 8080
name: http