Files
felhom.eu/documentation/audits/DRILL-backup-truth-2026-08-21/evidence/phase4-abandon
admin 7064596c2e
gates / gates (push) Successful in 16s
DRILL closeout: the scheduled cycle agrees, the abandonment sweep watched firing, R-366
The box's own 02:30 / 03:30 / 04:15 cycle ran unattended and agrees with the manual one
on every measure. The one that matters: R-355 is not an artefact of manual triggering —
the scheduled run again wrote paperless-ngx's PostgreSQL dump into a directory for a
stack that does not exist, and again left the app's own unit recording db_dumps: null.

Part 4.2's terminal deletion has now been observed. At 05:10 the sweep removed exactly
the recorded set-aside store and left the live repository untouched; at 05:13 the hub
dropped the sealed package that protected it and said so (event 3025). Both halves went
together, three minutes apart, and the controller cleared its own state. demo-felhom's
two preserved fixtures were verified untouched throughout.

R-366 (HIGH) filed, found incidentally: the 21 August reinstall orphaned demo-hp's PBS
whole-guest archives as well as its restic repo, so a rebuilt box loses BOTH off-premises
tiers at once. The restore-test caught it and named the key mismatch precisely; it is
merely called "a failed restore test" rather than "your older backups are unreadable".

demo-hp is left HEALTHY, not broken. Ceiling R-353 -> R-366.
2026-08-22 05:25:30 +02:00
..