Commit Graph

3 Commits

Author SHA1 Message Date
admin 5b6ade033f i18n slice 1 release C (controller v0.250.0): R-556 CLOSED, live evidence, R-565..R-568, decision 6 superseded
gates / gates (push) Successful in 23s
- audits/i18n-slice1-2026-09-17/C/: live before/after/en/back on demo-hp (CSRF redacted), hub report
  hu/en/hu, red-proofs, the switch fixture diff (89 of 89), green gate.
- 10-localisation.md: §2.2 executeTemplateLang facts, §2.3 what stays Hungarian + the English test's
  ASCII blind spot, §3 decision 6 SUPERSEDED 2026-09-17, §5 formal ceiling 16 and its under-count,
  English retrieval stems; §10 slice 1 done; §11 decision 6 struck.
- Register: R-556 closed to CLOSED-ITEMS; R-516 extended; R-565 (ASCII-only Hungarian invisible to the
  English page test), R-566 (three app-name page titles), R-567 (wizard nav highlight), R-568 (disk
  rows reorder). 260 -> 263 open.
- Capability map row, STATUS (needs you: the floor delivers the switch).

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_0159rPz1ZhFKsS53msqPYxtS
2026-09-17 18:50:16 +02:00
admin bc1a5db86c i18n: operator rulings 1b (banner + download page in scope, R-559 unblocked) and 7 (interface nouns translate)
gates / gates (push) Successful in 21s
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_0159rPz1ZhFKsS53msqPYxtS
2026-09-17 17:03:14 +02:00
admin 7462ac0b46 i18n starter: 10-localisation.md, live evidence, capability row, STATUS + CONTEXT
gates / gates (push) Successful in 21s
Design written after the spike ran (controller v0.247.0 live on demo-hp): mechanism,
flow, fallback, gates per language, catalog model, sliced plan with costs, operator
rulings 1-4 recorded, CC decisions 5-6, open decisions 1b and 7.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_0159rPz1ZhFKsS53msqPYxtS
2026-09-17 14:58:35 +02:00