Commit Graph

2 Commits

Author SHA1 Message Date
admin e34b614e5b docs: R-182 closed, R-90 closed on measurement, R-86 unblocked, ep0 record corrected
gates / gates (push) Successful in 7s
R-182 CLOSED (controller v0.194.0 + hub v0.90.0/.1), proven live on demo-hp. The
hub's notification_log for the run reads: two per-app failures RECORDED, one
digest SENT naming both, and the customer channel SKIPPED with operator_only.
Against the measured previous behaviour — two failures, one email naming one
app, one leaving no trace anywhere.

Scenario D proved itself on an event I had not planned: disk_critical alarmed on
two filesystems, the second was collapsed by the cooldown, and that collapse is
now visible WITH ITS KEY. Yesterday it would have left nothing at all.

A gap the spec did not anticipate is recorded with its fix: the per-app event
also fires from the periodic sweep, outside any run, so making it record-only
would have created a NEW silence. The sweep emits a digest too, with no run_id,
so it stays under the ordinary hourly cooldown.

ep0: MEASURED on the box — 7757 MB (8 GB), 4 vCPU, and the 4 GiB swapfile
SURVIVED the resize and is active (checked, because a resize is a stop/start).
The 40 GB local disk is UNCHANGED, so no disk figure was touched anywhere.

Five documents corrected — three of which the task's list did not name, found by
searching. Two audit/evidence documents ANNOTATED, body untouched: they record
what was true when written and that is their value.

R-90 CLOSED. R-86 unblocked and re-ranked, stated honestly: 8 GB is comfortable,
not unbounded — the original OOM was a 14.46 GB restore — so the restore-test
cadence should still be paced, just not by fear of the endpoint.

target-selection.md's "D-d did not name ep0 either way" is deliberately left
standing. It is the operator's question, not CC's.

STATUS.md 127 -> 83 lines, items rather than sentences.
2026-08-03 14:00:54 +02:00
admin bf099f6a10 docs: SPIKE — offsite-backup connectivity: plain WireGuard wins the ladder (transport decision made)
P0-P7 probe ladder on real ends (demo-felhom PVE host <-> throwaway Hetzner).
Verdict: GO at H1 — plain host-side WG, box-dials-out to a small public endpoint;
Headscale is a separable fleet layer, not a traversal necessity. Line is plain-NAT
(not CGNAT) with zero IPv6 — recorded honestly; CGNAT vantage deferred to Peti VM 110.
Real 2 GiB worst-case PBS backup over the tunnel at the full home uplink, pin intact.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PSK5g6qYLknKj8u3QAFEr6
2026-07-03 22:04:51 +02:00