1 Commits

Author SHA1 Message Date
admin 46504938ba R-50 Phase B: island migration runbook (B0) + drill validation (B1 PASS)
Idempotent LAN->island migration procedure with rollback table + abort criteria
(firewall LAST). Validated verbatim on drill VM 300: rolled to r50pre, migrated,
island /storage 200, LAN DNS held on the LAN IP (Finding-1 pin), apps healthy,
hub reports 0.96.0. No rollback fired.
2026-07-25 14:32:26 +02:00