2 Commits

Author SHA1 Message Date
admin fe1e81628d pre-push: refuse a push from a clone outside the felhom workspace (R-204 rider)
Identical to the assertion added in felhom-agent 0404f60,
app-catalog-felhom.eu ee2c810 and felhom-controller a91f055.
2026-08-05 10:48:24 +02:00
admin 9bd1a54d71 gates: one entry point (scripts/repo_gates.py) + pre-push hook
A census of all thirteen gate scripts across the four felhom repos on 2026-08-02 found one
clean correlation: every check a CLAUDE.md tells a person to run was passing, and two of the
four nobody is told to run were failing — one since 14 July. Neither failure was harmful in
effect (checked line by line); nothing would have said so if they had been. The fix is not
more gates, it is one place to run them from.

repo_gates.py runs site + hostinstall + hub-confirm + manifest-bearer + reuse-refs, streams
each gate's own output, and exits worst-wins non-zero. A missing gate script is a FAILURE and
prints the path tried — fail-closed, because a runner that quietly skips a gate is the
inert-seam failure this project has shipped four times. It copies catalog_gates.py (R-161),
NOT site_gates.py, which is a gate and not a runner.

.githooks/pre-push runs it with --fast and refuses the push. Honest limits are written into
the hook itself: per-clone (core.hooksPath is local config), and --no-verify bypasses it on
purpose. Any manual run WARNS when the clone is unarmed. Measured on git 2.47.3: a relative
core.hooksPath resolves correctly and the hook's cwd is the repo root from any subdirectory.

test_repo_gates.py is a SEAM test — it asserts each member gate's own distinctive stdout, not
the runner's summary line, which an inert runner prints while calling nothing. Red-proofed:
replacing run_gate's body with 'return 0' still prints 'all felhom.eu gates OK' and exits 0,
and turns the seam test red.
2026-08-02 15:22:44 +02:00