REPORT: CI run ids and conclusions for all six commits (all green)
gates / gates (push) Successful in 7s
gates / gates (push) Successful in 7s
This commit is contained in:
@@ -128,13 +128,18 @@ record of the constraint until the merge lands).
|
||||
|
||||
## 6. CI — run ids and conclusions
|
||||
|
||||
| Repo | Final commit | Run | Conclusion |
|
||||
|---|---|---|---|
|
||||
| `felhom-controller` | `9a3c485` | see below | see below |
|
||||
| `felhom.eu` | (docs commit) | see below | see below |
|
||||
Checked by PULL from `…/actions/tasks`, matching `head_sha` to each commit — CI emails only on
|
||||
failure, so a green that was never looked at is an assumption, not an observation. **Every commit this
|
||||
session, both repos, is green.**
|
||||
|
||||
*(Filled in from `…/actions/tasks?limit=3` after the final push — see the closing section of the
|
||||
session output; a green CI that was not looked at is an assumption, not an observation.)*
|
||||
| Repo | Commit | Task id | Run # | Conclusion |
|
||||
|---|---|---|---|---|
|
||||
| `felhom-controller` | `cf48214` (v0.191.0) | 31 | 11 | **success** |
|
||||
| `felhom-controller` | `5adae4d` (v0.191.1) | 34 | 12 | **success** |
|
||||
| `felhom-controller` | `9a3c485` (v0.191.2) | 35 | 13 | **success** |
|
||||
| `felhom.eu` | `179dd79` (hub v0.89.0) | 32 | 17 | **success** |
|
||||
| `felhom.eu` | `6d359a5` (manifest 0.89.0) | 33 | 18 | **success** |
|
||||
| `felhom.eu` | `41dbecb` (docs) | 36 | 19 | **success** |
|
||||
|
||||
## 7. `--no-verify`
|
||||
|
||||
|
||||
Reference in New Issue
Block a user