REPORT/STATUS: CI red for five pushes (BusyBox date), fixed in 40d34c5, job 1360 green
gates / gates (push) Failing after 11m50s
gates / gates (push) Failing after 11m50s
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_0159rPz1ZhFKsS53msqPYxtS
This commit is contained in:
@@ -17,6 +17,8 @@ open-items list went from 336 to 291. Report: `REPORT-burndown-2026-10-05.md`.**
|
||||
checked less than they claimed. No release was needed: nothing that runs on a box or on the hub changed.
|
||||
- **One real fix found on the way:** the hub's build script pushed a `latest` image tag on every release. Nothing used
|
||||
it; it is gone, and a test keeps it gone.
|
||||
- **You got 5 „CI failed" mails tonight — my fault, fixed.** The new test gate ran one of today's test suites on the CI
|
||||
machine for the first time; it uses a different `date` tool, and 9 tests failed. Fixed; CI is green again (job 1360).
|
||||
- **A new rule, so the list stops growing:** a small problem found during work (about 30 minutes) is fixed in that
|
||||
session and never added to the list. Every report now states four numbers: rows before, after, opened, closed.
|
||||
|
||||
|
||||