This website requires JavaScript.
Explore
Help
Sign In
admin
/
felhom.eu
Watch
1
Star
0
Fork
0
You've already forked felhom.eu
Code
Issues
Pull Requests
Actions
1
Packages
Projects
Releases
Wiki
Activity
All Workflows
gates.yml
925 workflow runs
Actor
All actors
admin
Status
All status
Success
Failure
Waiting
Running
R-267: the Configuration page, measured — 26.2s to ~10s, and what is left
gates.yml #175
:
Commit
1c14b91d6f
pushed by
admin
main
2026-08-08 18:03:35 +02:00
23s
View workflow file
deploy: hub 0.100.2 (connection reuse for the Gitea client)
gates.yml #174
:
Commit
047e296ad1
pushed by
admin
main
2026-08-08 17:57:18 +02:00
34s
View workflow file
hub: the Gitea client keeps its connections (MaxIdleConnsPerHost was 2)
gates.yml #173
:
Commit
e348c4ef6e
pushed by
admin
main
2026-08-08 17:56:00 +02:00
30s
View workflow file
deploy: hub 0.100.1 (the side-by-side dropdown resolve rides this image)
gates.yml #172
:
Commit
de0110b8da
pushed by
admin
main
2026-08-08 18:06:34 +02:00
14m51s
View workflow file
hub: resolve the two artifact dropdowns side by side, not one after the other
gates.yml #171
:
Commit
9ce8c631d3
pushed by
admin
main
2026-08-08 17:51:03 +02:00
33s
View workflow file
deploy: hub 0.100.0 — the manifest is the truth
gates.yml #170
:
Commit
5ef7b92b67
pushed by
admin
main
2026-08-08 17:43:45 +02:00
26s
View workflow file
hub v0.100.0 — the Configuration page took 26 seconds, and it was never hashing anything
gates.yml #169
:
Commit
7855d6355c
pushed by
admin
main
2026-08-08 17:42:28 +02:00
22s
View workflow file
R-265 CI timeout + golden 0.210.0 baked; R-221/R-259/R-258 closed, R-266 minted, G-3 unblocked
gates.yml #168
:
Commit
4a4a1e245a
pushed by
admin
main
2026-08-08 16:53:29 +02:00
34s
View workflow file
R-265: a CI run failed with NO LOG, and the alarm points at a log that does not exist
gates.yml #167
:
Commit
4f5784894e
pushed by
admin
main
2026-08-08 09:30:23 +02:00
19s
View workflow file
correct the vouch state: the operator vouched 0.208.0 DURING this session
gates.yml #166
:
Commit
dd55a3f98c
pushed by
admin
main
2026-08-08 09:26:11 +02:00
35s
View workflow file
docs: record the CI episode — three instrument defects, and the two-homes rule (R-260)
gates.yml #165
:
Commit
650cc8a4a7
pushed by
admin
main
2026-08-08 09:26:34 +02:00
13m54s
View workflow file
fix(gate): the wire-contract search shelled out to grep and read its failure as a finding
gates.yml #164
:
Commit
3bf62b95bb
pushed by
admin
main
2026-08-08 09:11:50 +02:00
36s
View workflow file
ci: give the wire-contract gate the sibling clone it needs (the hook and CI disagreed)
gates.yml #163
:
Commit
436abf39d5
pushed by
admin
main
2026-08-08 09:08:29 +02:00
37s
View workflow file
deploy: hub 0.99.0 — the manifest is the truth (R-260)
gates.yml #162
:
Commit
9771fd9c27
pushed by
admin
main
2026-08-08 09:03:53 +02:00
19s
View workflow file
golden 0.209.0 BAKED, PUBLISHED, ROUND-TRIP VERIFIED — the currency gate goes green (R-242)
gates.yml #161
:
Commit
2ce3c2a0f2
pushed by
admin
main
2026-08-08 09:02:23 +02:00
28s
View workflow file
CAMPAIGN 12 — the class sweep: golden 0.208.0 baked (awaiting vouch), R-256..R-263 filed, gating ranked
gates.yml #160
:
Commit
b7fb2117ae
pushed by
admin
main
2026-08-07 23:08:27 +02:00
22s
View workflow file
R-254 CLOSED both sites (controller v0.208.0); R-255 filed; R-242 red again
gates.yml #159
:
Commit
59527d00f9
pushed by
admin
main
2026-08-07 21:28:00 +02:00
22s
View workflow file
golden 0.207.0 BAKED, PUBLISHED, ROUND-TRIP VERIFIED and VOUCHED — the currency gate goes green
gates.yml #158
:
Commit
f651b31a7a
pushed by
admin
main
2026-08-07 21:00:20 +02:00
24s
View workflow file
walk5 venue TORN DOWN — census 168 rows -> 67, and R-244 grew by 30 as predicted
gates.yml #157
:
Commit
c1dec41328
pushed by
admin
main
2026-08-07 18:59:22 +02:00
13s
View workflow file
R-249/R-252/R-253 CLOSED (controller v0.207.0); R-254 filed; R-201's state field corrected
gates.yml #156
:
Commit
1fc38761a8
pushed by
admin
main
2026-08-07 18:18:30 +02:00
18s
View workflow file
R-201 CLOSED — the unaided recovery journey passes, both halves, on the fifth walk
gates.yml #155
:
Commit
3f4fb3825f
pushed by
admin
main
2026-08-07 17:25:02 +02:00
19s
View workflow file
walk5 (R-201, fifth walk): Phase A journal — fixture built, sentinels proved by name
gates.yml #154
:
Commit
879007aaec
pushed by
admin
main
2026-08-07 15:06:22 +02:00
22s
View workflow file
report: record the CI breakage the new gate caused, and its fix
gates.yml #153
:
Commit
10af63d0b0
pushed by
admin
main
2026-08-07 13:17:02 +02:00
20s
View workflow file
CI: give the golden-currency gate the sibling clone it needs, instead of letting it skip
gates.yml #152
:
Commit
6f25e02828
pushed by
admin
main
2026-08-07 13:15:45 +02:00
22s
View workflow file
CI: give the golden-currency gate the sibling clone it needs, instead of letting it skip
gates.yml #151
:
Commit
8e731e27ac
pushed by
admin
main
2026-08-07 13:15:19 +02:00
24s
View workflow file
golden 0.206.0 VOUCHED; demo-hp's stale flag cleared; session report
gates.yml #150
:
Commit
7850469d5b
pushed by
admin
main
2026-08-07 13:13:35 +02:00
10s
View workflow file
golden 0.206.0 baked, published, round-trip verified — NOT vouched; the gate goes green
gates.yml #149
:
Commit
721297ed5e
pushed by
admin
main
2026-08-07 13:16:34 +02:00
10m42s
View workflow file
R-242: build the gate the rule described — a release without a golden now fails the push
gates.yml #148
:
Commit
3ca9a7bbe6
pushed by
admin
main
2026-08-07 12:54:14 +02:00
15s
View workflow file
deploy hub v0.98.0 — the R-241 superseded-package purge
gates.yml #147
:
Commit
b12f8ec2f3
pushed by
admin
main
2026-08-07 12:21:32 +02:00
14s
View workflow file
R-241 FIXED: registers, capability map, STATUS, hub CHANGELOG v0.98.0
gates.yml #146
:
Commit
9657334fb7
pushed by
admin
main
2026-08-07 12:13:39 +02:00
18s
View workflow file
First
Previous
...
24
25
26
27
28
...
Next
Last