This website requires JavaScript.
Explore
Help
Sign In
admin
/
felhom.eu
Watch
1
Star
0
Fork
0
You've already forked felhom.eu
Code
Issues
Pull Requests
Actions
Packages
Projects
Releases
Wiki
Activity
All Workflows
gates.yml
743 workflow runs
Actor
All actors
admin
Status
All status
Success
Failure
Waiting
Running
hub: the Gitea client keeps its connections (MaxIdleConnsPerHost was 2)
gates.yml #173
:
Commit
e348c4ef6e
pushed by
admin
main
2026-08-08 17:56:00 +02:00
30s
View workflow file
deploy: hub 0.100.1 (the side-by-side dropdown resolve rides this image)
gates.yml #172
:
Commit
de0110b8da
pushed by
admin
main
2026-08-08 18:06:34 +02:00
14m51s
View workflow file
hub: resolve the two artifact dropdowns side by side, not one after the other
gates.yml #171
:
Commit
9ce8c631d3
pushed by
admin
main
2026-08-08 17:51:03 +02:00
33s
View workflow file
deploy: hub 0.100.0 — the manifest is the truth
gates.yml #170
:
Commit
5ef7b92b67
pushed by
admin
main
2026-08-08 17:43:45 +02:00
26s
View workflow file
hub v0.100.0 — the Configuration page took 26 seconds, and it was never hashing anything
gates.yml #169
:
Commit
7855d6355c
pushed by
admin
main
2026-08-08 17:42:28 +02:00
22s
View workflow file
R-265 CI timeout + golden 0.210.0 baked; R-221/R-259/R-258 closed, R-266 minted, G-3 unblocked
gates.yml #168
:
Commit
4a4a1e245a
pushed by
admin
main
2026-08-08 16:53:29 +02:00
34s
View workflow file
R-265: a CI run failed with NO LOG, and the alarm points at a log that does not exist
gates.yml #167
:
Commit
4f5784894e
pushed by
admin
main
2026-08-08 09:30:23 +02:00
19s
View workflow file
correct the vouch state: the operator vouched 0.208.0 DURING this session
gates.yml #166
:
Commit
dd55a3f98c
pushed by
admin
main
2026-08-08 09:26:11 +02:00
35s
View workflow file
docs: record the CI episode — three instrument defects, and the two-homes rule (R-260)
gates.yml #165
:
Commit
650cc8a4a7
pushed by
admin
main
2026-08-08 09:26:34 +02:00
13m54s
View workflow file
fix(gate): the wire-contract search shelled out to grep and read its failure as a finding
gates.yml #164
:
Commit
3bf62b95bb
pushed by
admin
main
2026-08-08 09:11:50 +02:00
36s
View workflow file
ci: give the wire-contract gate the sibling clone it needs (the hook and CI disagreed)
gates.yml #163
:
Commit
436abf39d5
pushed by
admin
main
2026-08-08 09:08:29 +02:00
37s
View workflow file
deploy: hub 0.99.0 — the manifest is the truth (R-260)
gates.yml #162
:
Commit
9771fd9c27
pushed by
admin
main
2026-08-08 09:03:53 +02:00
19s
View workflow file
golden 0.209.0 BAKED, PUBLISHED, ROUND-TRIP VERIFIED — the currency gate goes green (R-242)
gates.yml #161
:
Commit
2ce3c2a0f2
pushed by
admin
main
2026-08-08 09:02:23 +02:00
28s
View workflow file
CAMPAIGN 12 — the class sweep: golden 0.208.0 baked (awaiting vouch), R-256..R-263 filed, gating ranked
gates.yml #160
:
Commit
b7fb2117ae
pushed by
admin
main
2026-08-07 23:08:27 +02:00
22s
View workflow file
R-254 CLOSED both sites (controller v0.208.0); R-255 filed; R-242 red again
gates.yml #159
:
Commit
59527d00f9
pushed by
admin
main
2026-08-07 21:28:00 +02:00
22s
View workflow file
golden 0.207.0 BAKED, PUBLISHED, ROUND-TRIP VERIFIED and VOUCHED — the currency gate goes green
gates.yml #158
:
Commit
f651b31a7a
pushed by
admin
main
2026-08-07 21:00:20 +02:00
24s
View workflow file
walk5 venue TORN DOWN — census 168 rows -> 67, and R-244 grew by 30 as predicted
gates.yml #157
:
Commit
c1dec41328
pushed by
admin
main
2026-08-07 18:59:22 +02:00
13s
View workflow file
R-249/R-252/R-253 CLOSED (controller v0.207.0); R-254 filed; R-201's state field corrected
gates.yml #156
:
Commit
1fc38761a8
pushed by
admin
main
2026-08-07 18:18:30 +02:00
18s
View workflow file
R-201 CLOSED — the unaided recovery journey passes, both halves, on the fifth walk
gates.yml #155
:
Commit
3f4fb3825f
pushed by
admin
main
2026-08-07 17:25:02 +02:00
19s
View workflow file
walk5 (R-201, fifth walk): Phase A journal — fixture built, sentinels proved by name
gates.yml #154
:
Commit
879007aaec
pushed by
admin
main
2026-08-07 15:06:22 +02:00
22s
View workflow file
report: record the CI breakage the new gate caused, and its fix
gates.yml #153
:
Commit
10af63d0b0
pushed by
admin
main
2026-08-07 13:17:02 +02:00
20s
View workflow file
CI: give the golden-currency gate the sibling clone it needs, instead of letting it skip
gates.yml #152
:
Commit
6f25e02828
pushed by
admin
main
2026-08-07 13:15:45 +02:00
22s
View workflow file
CI: give the golden-currency gate the sibling clone it needs, instead of letting it skip
gates.yml #151
:
Commit
8e731e27ac
pushed by
admin
main
2026-08-07 13:15:19 +02:00
24s
View workflow file
golden 0.206.0 VOUCHED; demo-hp's stale flag cleared; session report
gates.yml #150
:
Commit
7850469d5b
pushed by
admin
main
2026-08-07 13:13:35 +02:00
10s
View workflow file
golden 0.206.0 baked, published, round-trip verified — NOT vouched; the gate goes green
gates.yml #149
:
Commit
721297ed5e
pushed by
admin
main
2026-08-07 13:16:34 +02:00
10m42s
View workflow file
R-242: build the gate the rule described — a release without a golden now fails the push
gates.yml #148
:
Commit
3ca9a7bbe6
pushed by
admin
main
2026-08-07 12:54:14 +02:00
15s
View workflow file
deploy hub v0.98.0 — the R-241 superseded-package purge
gates.yml #147
:
Commit
b12f8ec2f3
pushed by
admin
main
2026-08-07 12:21:32 +02:00
14s
View workflow file
R-241 FIXED: registers, capability map, STATUS, hub CHANGELOG v0.98.0
gates.yml #146
:
Commit
9657334fb7
pushed by
admin
main
2026-08-07 12:13:39 +02:00
18s
View workflow file
finalwalk teardown complete; R-244 filed; session report
gates.yml #145
:
Commit
094e93e828
pushed by
admin
main
2026-08-07 09:59:50 +02:00
15s
View workflow file
R-239 CLOSED (golden 0.205.0 vouched); R-241 ruling into the map and STATUS
gates.yml #144
:
Commit
db578cd44d
pushed by
admin
main
2026-08-07 09:27:55 +02:00
16s
View workflow file
First
Previous
...
18
19
20
21
22
...
Next
Last