v0.203.0: the box collects what the hub staged for it (R-218 consume half) + R-220's message
R-218's declaration half shipped in v0.201.0 and works. Its consume half never
existed. Reconcile ran exactly twice per process — at start-up and when the
recovery screen drives it — and BOTH fire before the hub has anything staged,
because the hub stages in RESPONSE to the declaration those runs precede.

Measured on the R-201 re-walk: unlock reconcile 11:43:07, hub staged 11:44:57
saying 'next cycle', a full report cycle ran 11:55:46, still unconsumed at
12:06. A guest command line applied it in 18 seconds — everything correct except
the trigger.

Bridge.RetryIfDeclared re-runs the SAME reconcile on a 5-minute tick, driven from
the box's own published declaration (OffboxReportStatus().State) — the very
statement the hub acts on, so the two cannot disagree.

Poll, not an ACK flag, decided on the promise: the no-target message says 'amint
megvannak' (no deadline) and the card says 'within a day'. Five minutes is inside
both by a wide margin and needs no hub change.

It stops by construction — a healthy box does no work and logs nothing — and the
settle gate is deliberately kept via ReconcileWhenSettled.

The marker was investigated and left alone: applied_marker lives in the guest's
DataDir, which a rebuild destroys, so it cannot suppress a legitimate re-run.

R-220's customer half: the refusal no longer tells the customer to choose from a
list that may be empty. It names the rebuild, points at the Meghajtók page, and
promises no outcome.

Red-proofs: remove the retry -> credential uncollected (the dead end reproduced);
drop the stop condition -> a healthy box hammers the hub; call Reconcile instead
of ReconcileWhenSettled -> settle gate bypassed; restore the old sentence -> the
impossible action returns.

28 packages ok, vet clean, all controller gates OK.
2026-08-06 12:56:12 +02:00
..