38848ffbeb
gates / gates (push) Successful in 21s
Golden 0.242.0 baked, round-trip verified and vouched (cadence rule, R-468). Fresh box from the public ISO on demo-hp: landed on the vouched set, two apps deployed and used, backup, remove, byte-identical restore, power cut and code typo all PASS. Stopped for a volunteer by R-493 (no instructions) and R-494 (the setup mail's dashboard link has no DNS; intervention I1). R-493..R-500 filed. Capability map: first-hour row added (PARTIAL), journey row scoped. Stopgap Hungarian volunteer guide written. Hub teardown layer pending. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_0159rPz1ZhFKsS53msqPYxtS
6 lines
220 B
Plaintext
6 lines
220 B
Plaintext
Logical volume "vm-9100-disk-1" successfully removed.
|
|
purging CT 9100 from related configurations..
|
|
leftovers in the VM: 0
|
|
qemu exited
|
|
1 virgin 0 B 2026-07-03 14:12:15 0000:00:00.000 0
|