fb652024ea
gates / gates (push) Successful in 7s
R-181 CLOSED (controller v0.193.0 + v0.193.1) and proven live on demo-hp for BOTH reserve terms. The reserve is now a per-app, per-run ADMISSION decision taken before the app's first write and covering all three write legs, and it gained a size term. The refusal's wording was not weakened; the behaviour moved so it became true, verified by sha256 tree fingerprint. R-156 CLOSED — papra's template mounts the app's own data root. Precondition re-measured rather than inherited (both boxes were wiped today). Part 4, documentation only, nothing built: - R-110 WAITING-ON-OPERATOR -> READY. Ruling: option (b), the installer's publish channel moves to a TAG. Recorded with the condition that decides whether it works at all — it must cover BOTH the /scripts/ git-sync and the nine files the installer fetches from raw/branch/main. - R-115 WAITING-ON-OPERATOR -> READY. Ruling: mechanism (b), a build-side gate refusing to deploy or vouch an unpublished version. The third instance (agent v0.120.0) would have silently downgraded both demo boxes while succeeding. R-182 NEW: the periodic status refresh has no admission scope, so a refused app re-alerts on every poll (measured: a second alert pair 13s after the run's). Pre-existing in v0.192.0; deliberately not fixed in the R-181 task. capability map: the local-backup row moves to PROVEN-LIVE in BOTH halves. ROADMAP: R-165 collapses to CLOSED; R-181 collapsed into it. 07-backup-architecture.md: the reserve's contract stated as what the code provides (S-1 — an architectural contract changed in the same session). STATUS.md trimmed 150 -> 111 lines, "What's broken" no longer holds shipped work, and the stale "After:" line (pointing at work that shipped on 2 August) is fixed.