Files
felhom.eu/documentation/audits/night-2026-09-23/E5-drill-reset.txt
T
admin 3e58c184f6
gates / gates (push) Successful in 27s
night shift 2026-09-23: the record, the register, the morning note
DRILL-night-2026-09-23.md: Parts A-E. 09 §3 decisions 21 (operator word),
22 and 23 (CC unattended, operator may reverse); §6.4 parts 4 and 6
(catalog half) shipped; §6.1a residuals R-658/R-659. Register 330 -> 336:
R-651..R-660 opened (R-658 and R-659 P1), R-650/R-640/R-499/R-626 closed.
Capability map, nightly rotation (opengist), STATUS (one question: the
floor), CONTEXT, REPORT. The floor stays 0.266.0.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_0159rPz1ZhFKsS53msqPYxtS
2026-09-24 00:24:04 +02:00

3 lines
193 B
Plaintext

drill origin/main=5d49a11b31fe live main=5d49a11b31fe has_actions=False (00:16)
5d49a11 nextcloud: 34.0.1 -> 34.0.4 (proven on the bench AND on 9202, with its test record) — files_may_change