Logo
Explore Help
Sign In
admin/felhom.eu
1
0
Fork 0
You've already forked felhom.eu
Code Issues Pull Requests Actions Packages Projects Releases Wiki Activity
Files
c75a9c8b7e392236fe7a67982d6b37b6827c63b0
felhom.eu/documentation/audits/sizing-2026-10-13
T
History
admin 048a43c521
gates / gates (push) Successful in 6m39s
Details
Night power drill complete: 8 real cuts on demo-hp (all came back), the estimator checked on a second machine and on 8 GB; R-1003..R-1009 filed; STATUS to one screen (history moved byte for byte); G18 and F5 corrected
2026-10-14 09:40:16 +02:00
..
evidence
Power-off spike (Part A) on the N100: plugswitch, wall-power figures, the hub's view
2026-10-13 19:15:08 +02:00
tools
Audit: what a Felhom box needs — floor, 64 apps' memory and CPU, power (N100 bench); R-993..R-995; R-231 due check read green
2026-10-13 13:23:51 +02:00
METHOD.md
Audit: what a Felhom box needs — floor, 64 apps' memory and CPU, power (N100 bench); R-993..R-995; R-231 due check read green
2026-10-13 13:23:51 +02:00
sizing.json
Power-off spike (Part A) on the N100: plugswitch, wall-power figures, the hub's view
2026-10-13 19:15:08 +02:00
SIZING.md
Night power drill complete: 8 real cuts on demo-hp (all came back), the estimator checked on a second machine and on 8 GB; R-1003..R-1009 filed; STATUS to one screen (history moved byte for byte); G18 and F5 corrected
2026-10-14 09:40:16 +02:00
Powered by Gitea Version: 1.26.2 Page: 154ms Template: 6ms
Auto
English
Bahasa Indonesia Deutsch English Español Français Gaeilge Italiano Latviešu Magyar nyelv Nederlands Polski Português de Portugal Português do Brasil Suomi Svenska Türkçe Čeština Ελληνικά Български Русский Українська فارسی മലയാളം 日本語 简体中文 繁體中文(台灣) 繁體中文(香港) 한국어
Licenses API