Power-off spike (Part A) on the N100: plugswitch, wall-power figures, the hub's view
plugswitch.py refuses 'off' unless 20 s of readings show the N100 is already off (standby + 1 W,
no ping); 7 tests, each check red-proofed. By hand: guest shutdown 12 s, host off, 0.0 W; the hub
stayed silent and 'ONLINE' for 18 min; plug off/on did not start the N100, its power button did
(dashboard in 42 s). Wall figures into SIZING.md 4 and sizing.json power (8.5 / 20.7 / 0.0 W).
2026-10-13 19:15:08 +02:00

16 lines
615 B
Plaintext

up after 5s (200)
admin-sign-up 201
token length 39
@1791909148 action_start upload
@1791909228 upload_done ok=200 bad=0
t=5s jobs pending=363
t=65s jobs pending=407
t=125s jobs pending=221
t=185s jobs pending=195
t=245s jobs pending=169
t=305s jobs pending=64
t=365s jobs pending=0
@1791909590 action_end jobs-idle
{"photos":200,"videos":0,"usage":833025787,"usagePhotos":833025787,"usageVideos":0,"usageByUser":[{"userId":"2738a268-8f74-4b76-9ad1-d4fb705c4116","userName":"Bench","photos":200,"videos":0,"usage":833025787,"usagePhotos":833025787,"usageVideos":0,"quotaSizeInBytes":null}]}