This website requires JavaScript.
Explore
Help
Sign In
admin
/
felhom.eu
Watch
1
Star
0
Fork
0
You've already forked felhom.eu
Code
Issues
Pull Requests
Actions
Packages
Projects
Releases
Wiki
Activity
Files
adc9dee0e322ae7f0779fedc44bafbf01aae6d84
felhom.eu
/
documentation
/
architecture
/
capability-map-detail
T
History
admin
e3b785f33a
gates / gates (push)
Successful in 6m36s
Details
Immich repair on every box: rollout read-back, R-1021 closed, R-1007 dated line, F12 fleet delivery, STATUS, report
2026-10-14 19:28:13 +02:00
..
A.md
answers 2026-10-12 Parts D, F, G: controller 0.308.0 delivered, the capability map restructured, the notification design; 128 -> 97
2026-10-12 15:54:44 +02:00
B.md
answers 2026-10-12 Parts D, F, G: controller 0.308.0 delivered, the capability map restructured, the notification design; 128 -> 97
2026-10-12 15:54:44 +02:00
C.md
answers 2026-10-12 Parts D, F, G: controller 0.308.0 delivered, the capability map restructured, the notification design; 128 -> 97
2026-10-12 15:54:44 +02:00
D.md
answers 2026-10-12 Parts D, F, G: controller 0.308.0 delivered, the capability map restructured, the notification design; 128 -> 97
2026-10-12 15:54:44 +02:00
E.md
answers 2026-10-12 Parts D, F, G: controller 0.308.0 delivered, the capability map restructured, the notification design; 128 -> 97
2026-10-12 15:54:44 +02:00
F.md
Immich repair on every box: rollout read-back, R-1021 closed, R-1007 dated line, F12 fleet delivery, STATUS, report
2026-10-14 19:28:13 +02:00
G.md
Night power drill complete: 8 real cuts on demo-hp (all came back), the estimator checked on a second machine and on 8 GB; R-1003..R-1009 filed; STATUS to one screen (history moved byte for byte); G18 and F5 corrected
2026-10-14 09:40:16 +02:00
H.md
answers 2026-10-12 Parts D, F, G: controller 0.308.0 delivered, the capability map restructured, the notification design; 128 -> 97
2026-10-12 15:54:44 +02:00