Files
felhom.eu/documentation/audits/update-night-2026-09-21/apps/tandoor-before-probe-fix-2026-09-21/app-logs-after.txt
T
admin a975cfde5b
gates / gates (push) Successful in 28s
probe fix, the gate, and the promotion train (R-618 closed, R-630..632 opened)
Part 1: tandoor/zipline/wger probes corrected in the catalog and red-proofed live on 9202 in both
directions - "Nem egeszseges" with the front door serving 200, then "Fut" after the real sync with
no redeploy. tandoor's failed edge re-walked: done at +41.1s where it was failed at +361.9s.

Part 2: fifteen proven versions on the live catalog, one commit per app; the guarded Update pressed
on four apps on demo-hp, all four done.

Opened: R-630 (paperless-ngx's probe has never run on any box - a silent absence, worse than the
wrong probe that was found in one night), R-631 (five templates no static rule can judge),
R-632 (28 of 53 templates never deployed by any drill). Closed: R-618.

Register 318 -> 321. No product code.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_0159rPz1ZhFKsS53msqPYxtS
2026-09-22 11:10:58 +02:00

0 lines
0 B
Plaintext