Files
felhom.eu/documentation/audits
admin 95e2fba8ca
gates / gates (push) Successful in 7s
CAMPAIGN-11 doc: invariants, RTO, teardown-owed, hygiene
Invariants across the phase boundaries: I1/I4(product)/I5/I7 held; I3 breached
twice (R-227's raw Bad Gateway, and R-220's refusal naming an impossible
action, reproduced live a third time); I6 breached twice (R-224, R-225). I2 is
recorded as untested rather than passed, because F10 could not be injected.
I4 was breached by the HARNESS, not the product — sourcing ~/.config/credentials
echoed two demo-box recovery codes into the transcript.

RTO unchanged and explicitly not re-measured: Phase 2's faults are not a
re-walk. Phase 1's 61 attended minutes stand; the unaided number stays
undefined.

Teardown recorded as OWED with all three layers named plus the off-site side —
including that the campaign's sub-account now holds TWO repos, the fresh one
and the 12 535 KB set-aside history, and that demo-felhom/demo-hp namespaces on
ep0 must not be touched.
2026-08-06 00:00:53 +02:00
..