95e2fba8ca
gates / gates (push) Successful in 7s
Invariants across the phase boundaries: I1/I4(product)/I5/I7 held; I3 breached twice (R-227's raw Bad Gateway, and R-220's refusal naming an impossible action, reproduced live a third time); I6 breached twice (R-224, R-225). I2 is recorded as untested rather than passed, because F10 could not be injected. I4 was breached by the HARNESS, not the product — sourcing ~/.config/credentials echoed two demo-box recovery codes into the transcript. RTO unchanged and explicitly not re-measured: Phase 2's faults are not a re-walk. Phase 1's 61 attended minutes stand; the unaided number stays undefined. Teardown recorded as OWED with all three layers named plus the off-site side — including that the campaign's sub-account now holds TWO repos, the fresh one and the 12 535 KB set-aside history, and that demo-felhom/demo-hp namespaces on ep0 must not be touched.