This website requires JavaScript.
Explore
Help
Sign In
admin
/
felhom.eu
Watch
1
Star
0
Fork
0
Code
Issues
Pull Requests
Actions
Packages
Projects
Releases
Wiki
Activity
Files
9258cdd11c444cfccda5d60199eab507f698e2fe
felhom.eu
/
documentation
/
audits
/
night-2026-10-25
T
History
admin
9258cdd11c
gates / gates (push)
Successful in 13m42s
Details
Night 2026-10-25 Part 4–5: each fix's [DESIGN] line (04, 05, 07, 08, 11, 13, 15), the register (R-1261, R-1281, R-1282, R-1288, R-1280, R-1285, R-1283, R-1287, R-1289, R-1278 to VERIFY; R-1286 waiting on the operator; R-1291 and R-1292 opened), STATUS (D51 Kimai, the Monday list), the night report with its three-layer teardown, and the rig evidence (scanned: 0 known-secret hits)
2026-10-25 23:47:13 +01:00
..
rig
Night 2026-10-25 Part 4–5: each fix's [DESIGN] line (04, 05, 07, 08, 11, 13, 15), the register (R-1261, R-1281, R-1282, R-1288, R-1280, R-1285, R-1283, R-1287, R-1289, R-1278 to VERIFY; R-1286 waiting on the operator; R-1291 and R-1292 opened), STATUS (D51 Kimai, the Monday list), the night report with its three-layer teardown, and the rig evidence (scanned: 0 known-secret hits)
2026-10-25 23:47:13 +01:00
tools
Night 2026-10-25 Part 4–5: each fix's [DESIGN] line (04, 05, 07, 08, 11, 13, 15), the register (R-1261, R-1281, R-1282, R-1288, R-1280, R-1285, R-1283, R-1287, R-1289, R-1278 to VERIFY; R-1286 waiting on the operator; R-1291 and R-1292 opened), STATUS (D51 Kimai, the Monday list), the night report with its three-layer teardown, and the rig evidence (scanned: 0 known-secret hits)
2026-10-25 23:47:13 +01:00
part1-artifacts.txt
Night 2026-10-25 Parts 1–3: every named artifact still downloads; installer 1.36.1 published (operator yes) and its three refusal sentences seen live; D50 = A recorded (09 §3 262, CONTEXT, build skill); R-1284 and R-1290 closed; R-1261 rig evidence so far
2026-10-25 20:52:56 +01:00
part2-installer-messages.txt
Night 2026-10-25 Parts 1–3: every named artifact still downloads; installer 1.36.1 published (operator yes) and its three refusal sentences seen live; D50 = A recorded (09 §3 262, CONTEXT, build skill); R-1284 and R-1290 closed; R-1261 rig evidence so far
2026-10-25 20:52:56 +01:00
r1261-qbittorrent-api-measured.txt
Night 2026-10-25 Parts 1–3: every named artifact still downloads; installer 1.36.1 published (operator yes) and its three refusal sentences seen live; D50 = A recorded (09 §3 262, CONTEXT, build skill); R-1284 and R-1290 closed; R-1261 rig evidence so far
2026-10-25 20:52:56 +01:00
redproof-d50.txt
Night 2026-10-25 Parts 1–3: every named artifact still downloads; installer 1.36.1 published (operator yes) and its three refusal sentences seen live; D50 = A recorded (09 §3 262, CONTEXT, build skill); R-1284 and R-1290 closed; R-1261 rig evidence so far
2026-10-25 20:52:56 +01:00
redproof-hub-r1287-r1289.txt
hub v0.171.0 (unreleased): a set-aside-only backup digest mails as a warning that says nothing failed (R-1287); a test build is never the fleet's newest (R-1289). Red-proved. Commit only.
2026-10-25 21:21:18 +01:00
redproof-r1261.txt
Night 2026-10-25 Parts 1–3: every named artifact still downloads; installer 1.36.1 published (operator yes) and its three refusal sentences seen live; D50 = A recorded (09 §3 262, CONTEXT, build skill); R-1284 and R-1290 closed; R-1261 rig evidence so far
2026-10-25 20:52:56 +01:00
redproof-r1278.txt
Night 2026-10-25 Part 4–5: each fix's [DESIGN] line (04, 05, 07, 08, 11, 13, 15), the register (R-1261, R-1281, R-1282, R-1288, R-1280, R-1285, R-1283, R-1287, R-1289, R-1278 to VERIFY; R-1286 waiting on the operator; R-1291 and R-1292 opened), STATUS (D51 Kimai, the Monday list), the night report with its three-layer teardown, and the rig evidence (scanned: 0 known-secret hits)
2026-10-25 23:47:13 +01:00
redproof-r1280.txt
Night 2026-10-25 Part 4–5: each fix's [DESIGN] line (04, 05, 07, 08, 11, 13, 15), the register (R-1261, R-1281, R-1282, R-1288, R-1280, R-1285, R-1283, R-1287, R-1289, R-1278 to VERIFY; R-1286 waiting on the operator; R-1291 and R-1292 opened), STATUS (D51 Kimai, the Monday list), the night report with its three-layer teardown, and the rig evidence (scanned: 0 known-secret hits)
2026-10-25 23:47:13 +01:00
redproof-r1281.txt
Night 2026-10-25 Part 4–5: each fix's [DESIGN] line (04, 05, 07, 08, 11, 13, 15), the register (R-1261, R-1281, R-1282, R-1288, R-1280, R-1285, R-1283, R-1287, R-1289, R-1278 to VERIFY; R-1286 waiting on the operator; R-1291 and R-1292 opened), STATUS (D51 Kimai, the Monday list), the night report with its three-layer teardown, and the rig evidence (scanned: 0 known-secret hits)
2026-10-25 23:47:13 +01:00
redproof-r1283.txt
Night 2026-10-25 Part 4–5: each fix's [DESIGN] line (04, 05, 07, 08, 11, 13, 15), the register (R-1261, R-1281, R-1282, R-1288, R-1280, R-1285, R-1283, R-1287, R-1289, R-1278 to VERIFY; R-1286 waiting on the operator; R-1291 and R-1292 opened), STATUS (D51 Kimai, the Monday list), the night report with its three-layer teardown, and the rig evidence (scanned: 0 known-secret hits)
2026-10-25 23:47:13 +01:00
redproof-r1285.txt
Night 2026-10-25 Part 4–5: each fix's [DESIGN] line (04, 05, 07, 08, 11, 13, 15), the register (R-1261, R-1281, R-1282, R-1288, R-1280, R-1285, R-1283, R-1287, R-1289, R-1278 to VERIFY; R-1286 waiting on the operator; R-1291 and R-1292 opened), STATUS (D51 Kimai, the Monday list), the night report with its three-layer teardown, and the rig evidence (scanned: 0 known-secret hits)
2026-10-25 23:47:13 +01:00
redproof-r1286.txt
Night 2026-10-25 Part 4–5: each fix's [DESIGN] line (04, 05, 07, 08, 11, 13, 15), the register (R-1261, R-1281, R-1282, R-1288, R-1280, R-1285, R-1283, R-1287, R-1289, R-1278 to VERIFY; R-1286 waiting on the operator; R-1291 and R-1292 opened), STATUS (D51 Kimai, the Monday list), the night report with its three-layer teardown, and the rig evidence (scanned: 0 known-secret hits)
2026-10-25 23:47:13 +01:00
redproof-r1288-r1282.txt
Night 2026-10-25 Part 4–5: each fix's [DESIGN] line (04, 05, 07, 08, 11, 13, 15), the register (R-1261, R-1281, R-1282, R-1288, R-1280, R-1285, R-1283, R-1287, R-1289, R-1278 to VERIFY; R-1286 waiting on the operator; R-1291 and R-1292 opened), STATUS (D51 Kimai, the Monday list), the night report with its three-layer teardown, and the rig evidence (scanned: 0 known-secret hits)
2026-10-25 23:47:13 +01:00