77a5a1154b
gates / gates (push) Failing after 19s
STATUS.md: header said 2026-08-23 over a 2026-08-30 body, and two "Waiting on you" items were both numbered 4 — both fixed. R-399 leaves that section (decided and shipped); the depth change is stated in plain words and the remaining items each say what happens if Viktor does nothing. 00-capability-map.md: the off-site verification row now carries its DEPTH, and its live citation is the 2026-08-31 run at 100%. The weekly firing at the new depth stays IMPLEMENTED, not PROVEN-LIVE. 07-backup-architecture.md §10.2: R-399 recorded closed, with the one sentence that stops it being turned back down — the structure check PASSED a size-preserving pack corruption. R-87 untouched and still OPEN. Register: R-399 and R-400 compressed into CLOSED-ITEMS.md with their reasoning kept and 300d7e8 named as the commit holding the originals. R-401 filed with a TRIGGER (the slow-check WARN firing) rather than a date. R-402 filed: the integrity verdict and its depth are on the wire and no hub surface reads either. OPEN 166 -> 165, CLOSED 148 -> 150. wire_contract_gate.py: offsite.last_integrity_depth allowlisted WITH ITS REASON beside its sibling last_integrity_ok, both to be deleted together when a hub surface is built (R-402).