5c97fbc397
gates / gates (push) Successful in 8s
Controller v0.189.0 implements operator decision D-b. Docs only here; no hub change and no hub version bump. - architecture/02-controller-module-map.md §0a — NEW, and it is the S-1 contract: desired (app.yaml) / in-flight (own marker file) / observed (not persisted), with the rule that ties them — never derive one from another. Absent desired state means UNKNOWN, never "running". One file, one writer. D-b's binding safety rule quoted verbatim. - 00-capability-map.md — the boot-recovery row now rests on a recorded signal, with the three live flows from 9201. The interrupted-operation half is marked IMPLEMENTED, not PROVEN-LIVE: nobody killed the controller mid-backup on metal. - OPEN-ITEMS/ROADMAP — R-166 SHIPPED with both blocking facts and their answers; R-157 mechanism B CLOSED and A restated as the whole item; R-170 NEW (the drive-backed boot gate still infers a Stop from a container count). - STATUS.md — the "an app can stay switched off and nothing says so" line rewritten to what is actually left: timing. - CLAUDE.md — end-of-session checklist gains: confirm your own last push's CI run went green, BY RUN ID. The failure email is a push signal; this is the pull check. - CONTEXT.md S-12 — the rulings, and the two lessons worth carrying: a test that constructs the thing it should prove the caller constructs is hollow (its red-proof will say so), and a field-by-field struct rebuild in a save path is a defect on sight.