41dbecb264
gates / gates (push) Successful in 8s
R-167/R-158 shipped and proven live (controller v0.191.x, hub v0.89.0): two new capability-map rows PROVEN-LIVE with live citations, and 07-backup-architecture.md §7.5's closing claim "nothing warns when an app crosses the line" is now false and rewritten (S-1: an architectural contract changed in the same session). §7.5 also gains the caveat that its size bound is ONE BOX'S, not the fleet's. Part 3 SPIKE (audits/SPIKE-r165-mp1-merge-2026-08-02.md): M1-M5 measured, NO layout touched. Three findings the merge session must not re-derive: "the layout" is not one thing (200G/50G vs 50G/20G vs 16G/8G); mp1 is a BULKHEAD and not only a ceiling, so after the merge an overflow reaches /var/lib/docker; the golden fails closed on the split in four places. D-a's condition (1) is currently SATISFIED — no external box is in the hub's register, and both demo boxes are Tier 0 and reinstallable. Recommendation given, choice NOT made — it ends at the operator's ruling. CONTEXT.md S-11 (D-c's routing, and why R-158's own backup_failed proposal was overruled) and S-12 (the monitoring landed BEFORE the merge). STATUS.md gains the plain-language section and the merge decision, with two older entries trimmed so the page did not grow. New rows R-174 (closed same session), R-175, R-176, R-177; each ID grepped free before minting.