Files
felhom.eu/documentation/audits/evidence-drill-fresh-install-0242-2026-09-14/screens/s11-focus-tab.png
T
admin 38848ffbeb
gates / gates (push) Successful in 21s
drill: a stranger's first hour on 0.242.0 — 1 intervention, not ready for a volunteer
Golden 0.242.0 baked, round-trip verified and vouched (cadence rule, R-468).
Fresh box from the public ISO on demo-hp: landed on the vouched set, two apps
deployed and used, backup, remove, byte-identical restore, power cut and code
typo all PASS. Stopped for a volunteer by R-493 (no instructions) and R-494
(the setup mail's dashboard link has no DNS; intervention I1). R-493..R-500
filed. Capability map: first-hour row added (PARTIAL), journey row scoped.
Stopgap Hungarian volunteer guide written. Hub teardown layer pending.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_0159rPz1ZhFKsS53msqPYxtS
2026-09-14 16:17:47 +02:00

4.5 KiB
1280x800px