1dc86523b5
G2/G4/G5/G6/G7 -> LIVE-VALIDATED; G1 -> DONE (armed-key round-trip proven, manifest bump confirmed); G9 -> deferred to GL-7; G10 -> GL-7 prereq. Findings F1/F2/F3/F6/F7 filed for a v1.11.4 installer follow-up (none block Peti). REPORT.md = the GL-6 drill. Next: GL-7. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01PSK5g6qYLknKj8u3QAFEr6