Files
felhom.eu/documentation/architecture
admin 0a399e3c02 docs(capability-map): offsite-restore stays PARTIAL — the 6D scope lesson applies
The operator confirmed the immich timeline renders correctly after the
2026-07-20 reconstitute, which was the last named residual. But that run
restored over an already-good state (11 assets before, 11 after), so it
proves the H4 window is closed and the operation is clean — it is NOT a
destroy-then-recover drill.

Flipping the row on it would repeat the 6D overclaim verbatim: 'immich
end-to-end from offsite alone' must not be claimed by a run in which
nothing was ever lost. Row stays PARTIAL pending a real destructive drill.
2026-07-20 19:07:20 +02:00
..