# REPORT — night shift 2026-09-24/25 (felhom.eu side) The full record is `documentation/audits/DRILL-night-2026-09-25.md` (opens with "Not done, or changed"). This repo carried: the evidence tree `documentation/audits/night-2026-09-25/`; `09` (part 7 shipped, decisions 31–33), `03` (delivery + R-685), `07` (the fourth leg; demo-hp retention), `08` (what decision 28's suppression covers), the capability map; the register (341 → 338 rows); `STATUS.md`; the hub's global floor raised to 0.271.0 (MinAgent 0.131.0) through the operator UI endpoint; `scripts/wire_contract_gate.py` allowlists the report's new `update_leg` with its reason. No hub release.