burn-down Part B: 14 small rows fixed and closed across four repos (306 -> 292); no :latest in the hub build; gate list pinned; closed-id duplicates refused; R-262 subset pinned
gates / gates (push) Failing after 1m40s

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_0159rPz1ZhFKsS53msqPYxtS
This commit is contained in:
2026-10-05 17:10:38 +02:00
parent f5a0aeb0b8
commit b26d292a64
19 changed files with 220 additions and 35 deletions
@@ -0,0 +1,9 @@
# ISO release 1.28.0 — 2026-09-16 (pointer)
The gate record for this image was made inside an audit about something else, before the one-home rule
(`runbooks/iso-release-gate.md` „Result recording", R-588):
- `documentation/audits/evidence-backup-promise-2026-09-16/phaseD-iso-gate.txt` — run 2026-09-16T15:07:32Z against
`felhom-installer-1.28.0-pve9.2-1.iso`, sha256 `a4cd9b6ddcb55bae3700ab307084d2b699330cc20710688d5816318f04f6d635`.
Nothing was re-run for this pointer; it only makes the record findable by looking.