probe fix, the gate, and the promotion train (R-618 closed, R-630..632 opened)
gates / gates (push) Successful in 28s
gates / gates (push) Successful in 28s
Part 1: tandoor/zipline/wger probes corrected in the catalog and red-proofed live on 9202 in both directions - "Nem egeszseges" with the front door serving 200, then "Fut" after the real sync with no redeploy. tandoor's failed edge re-walked: done at +41.1s where it was failed at +361.9s. Part 2: fifteen proven versions on the live catalog, one commit per app; the guarded Update pressed on four apps on demo-hp, all four done. Opened: R-630 (paperless-ngx's probe has never run on any box - a silent absence, worse than the wrong probe that was found in one night), R-631 (five templates no static rule can judge), R-632 (28 of 53 templates never deployed by any drill). Closed: R-618. Register 318 -> 321. No product code. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_0159rPz1ZhFKsS53msqPYxtS
This commit is contained in:
File diff suppressed because one or more lines are too long
Reference in New Issue
Block a user