Backlog triage Part B: 125 finished rows + 20 id-less rows moved to CLOSED-ITEMS (full text at 9e2786c); open rows normalised to one 6-column shape; narratives archived verbatim; closed_register_gate RULE 3 refuses a finished row in OPEN-ITEMS (decoys, seen red); rules rehomed to CONTEXT + 07 §11; loose notes triaged; R-814..R-819 filed; register 444 -> 325
gates / gates (push) Successful in 30s

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_0159rPz1ZhFKsS53msqPYxtS
This commit is contained in:
2026-10-03 09:17:22 +02:00
parent 9e2786c907
commit 71b8c8c62b
22 changed files with 1080 additions and 815 deletions
@@ -5,7 +5,7 @@
Source findings: `DRILL-day0-cleanroom-2026-07-03.md` §9 **B5** (golden bakes a pre-floor controller →
mandatory manual D.1b on every fresh install) and **B1** (controller-bootstrap only fires at boot; the
hot-plugged config mount needed the installer's reboot crutch). Also closes the stale backlog note
`documentation/backlog/FOLLOWUP-golden-default-controller-tag.md`.
`documentation/archive/FOLLOWUP-golden-default-controller-tag.md` (moved from `backlog/` 2026-10-03).
**Verdict (short):** both findings are FIXED in the product. A fresh Day-0 install now lands controller
**0.98.3** on first boot and self-manages from there (no D.1b), and the baked