Power-off live proof complete (R-998, R-999 closed): the hub held 2 h 56 min, the power button brought the N100 back, the hold ended; HP plug + BIOS; R-1002 filed; F11 PROVEN-LIVE
gates / gates (push) Successful in 6m45s

This commit is contained in:
2026-10-14 00:08:56 +02:00
parent 95d293b911
commit 50bd3f168b
28 changed files with 8341 additions and 9 deletions
+5
View File
@@ -194,6 +194,11 @@ with `tinytuya scan` if it stops answering). Read it from DooPlex with
installed on purpose**: it reads the plug through Tuya's cloud and keeps its history. Keys live only in DooPlex
`~/.config/felhom-bench/`. `audits/plugmeter-2026-10-13/`.
**demo-hp is on a second metered plug** (LAN `192.168.0.107`; `--plug hp`). Off with the plug on it draws 0–3.2 W.
**After a power cut:** demo-hp starts by itself (BIOS „After Power Loss = Previous State", set 2026-10-13); the N100 does
NOT start after a plug off/on when it was switched off first — BIOS not read yet (no monitor). `plugswitch.py off` refuses
a running machine. `audits/poweroff-2026-10-13/`.
## Tailscale on demo-hp is an OPERATOR-LAB EXCEPTION
> **Read this before any product-shape audit.** `demo-hp` is **customer-shaped** — it is a normal