Night power drill complete: 8 real cuts on demo-hp (all came back), the estimator checked on a second machine and on 8 GB; R-1003..R-1009 filed; STATUS to one screen (history moved byte for byte); G18 and F5 corrected
gates / gates (push) Successful in 6m39s
gates / gates (push) Successful in 6m39s
This commit is contained in: