This website requires JavaScript.
Explore
Help
Sign In
admin
/
felhom.eu
Watch
1
Star
0
Fork
0
Code
Issues
Pull Requests
Actions
Packages
Projects
Releases
Wiki
Activity
All Workflows
gates
security-watch
Other workflows
1
probe.yml
Management
Job queue
1489 workflow runs
Actor
All actors
admin
Status
All status
Success
Failure
Canceled
Skipped
Waiting
Running
Blocked
Canceling
Branch
All branches
main
hub v0.100.0 — the Configuration page took 26 seconds, and it was never hashing anything
gates #169
:
Commit
7855d6355c
pushed by
admin
main
2026-08-08 17:42:28 +02:00
22s
View workflow file
R-265 CI timeout + golden 0.210.0 baked; R-221/R-259/R-258 closed, R-266 minted, G-3 unblocked
gates #168
:
Commit
4a4a1e245a
pushed by
admin
main
2026-08-08 16:53:29 +02:00
34s
View workflow file
R-265: a CI run failed with NO LOG, and the alarm points at a log that does not exist
gates #167
:
Commit
4f5784894e
pushed by
admin
main
2026-08-08 09:30:23 +02:00
19s
View workflow file
correct the vouch state: the operator vouched 0.208.0 DURING this session
gates #166
:
Commit
dd55a3f98c
pushed by
admin
main
2026-08-08 09:26:11 +02:00
35s
View workflow file
docs: record the CI episode — three instrument defects, and the two-homes rule (R-260)
gates #165
:
Commit
650cc8a4a7
pushed by
admin
main
2026-08-08 09:26:34 +02:00
13m54s
View workflow file
fix(gate): the wire-contract search shelled out to grep and read its failure as a finding
gates #164
:
Commit
3bf62b95bb
pushed by
admin
main
2026-08-08 09:11:50 +02:00
36s
View workflow file
ci: give the wire-contract gate the sibling clone it needs (the hook and CI disagreed)
gates #163
:
Commit
436abf39d5
pushed by
admin
main
2026-08-08 09:08:29 +02:00
37s
View workflow file
deploy: hub 0.99.0 — the manifest is the truth (R-260)
gates #162
:
Commit
9771fd9c27
pushed by
admin
main
2026-08-08 09:03:53 +02:00
19s
View workflow file
golden 0.209.0 BAKED, PUBLISHED, ROUND-TRIP VERIFIED — the currency gate goes green (R-242)
gates #161
:
Commit
2ce3c2a0f2
pushed by
admin
main
2026-08-08 09:02:23 +02:00
28s
View workflow file
CAMPAIGN 12 — the class sweep: golden 0.208.0 baked (awaiting vouch), R-256..R-263 filed, gating ranked
gates #160
:
Commit
b7fb2117ae
pushed by
admin
main
2026-08-07 23:08:27 +02:00
22s
View workflow file
R-254 CLOSED both sites (controller v0.208.0); R-255 filed; R-242 red again
gates #159
:
Commit
59527d00f9
pushed by
admin
main
2026-08-07 21:28:00 +02:00
22s
View workflow file
golden 0.207.0 BAKED, PUBLISHED, ROUND-TRIP VERIFIED and VOUCHED — the currency gate goes green
gates #158
:
Commit
f651b31a7a
pushed by
admin
main
2026-08-07 21:00:20 +02:00
24s
View workflow file
walk5 venue TORN DOWN — census 168 rows -> 67, and R-244 grew by 30 as predicted
gates #157
:
Commit
c1dec41328
pushed by
admin
main
2026-08-07 18:59:22 +02:00
13s
View workflow file
R-249/R-252/R-253 CLOSED (controller v0.207.0); R-254 filed; R-201's state field corrected
gates #156
:
Commit
1fc38761a8
pushed by
admin
main
2026-08-07 18:18:30 +02:00
18s
View workflow file
R-201 CLOSED — the unaided recovery journey passes, both halves, on the fifth walk
gates #155
:
Commit
3f4fb3825f
pushed by
admin
main
2026-08-07 17:25:02 +02:00
19s
View workflow file
walk5 (R-201, fifth walk): Phase A journal — fixture built, sentinels proved by name
gates #154
:
Commit
879007aaec
pushed by
admin
main
2026-08-07 15:06:22 +02:00
22s
View workflow file
report: record the CI breakage the new gate caused, and its fix
gates #153
:
Commit
10af63d0b0
pushed by
admin
main
2026-08-07 13:17:02 +02:00
20s
View workflow file
CI: give the golden-currency gate the sibling clone it needs, instead of letting it skip
gates #152
:
Commit
6f25e02828
pushed by
admin
main
2026-08-07 13:15:45 +02:00
22s
View workflow file
CI: give the golden-currency gate the sibling clone it needs, instead of letting it skip
gates #151
:
Commit
8e731e27ac
pushed by
admin
main
2026-08-07 13:15:19 +02:00
24s
View workflow file
golden 0.206.0 VOUCHED; demo-hp's stale flag cleared; session report
gates #150
:
Commit
7850469d5b
pushed by
admin
main
2026-08-07 13:13:35 +02:00
10s
View workflow file
golden 0.206.0 baked, published, round-trip verified — NOT vouched; the gate goes green
gates #149
:
Commit
721297ed5e
pushed by
admin
main
2026-08-07 13:16:34 +02:00
10m42s
View workflow file
R-242: build the gate the rule described — a release without a golden now fails the push
gates #148
:
Commit
3ca9a7bbe6
pushed by
admin
main
2026-08-07 12:54:14 +02:00
15s
View workflow file
deploy hub v0.98.0 — the R-241 superseded-package purge
gates #147
:
Commit
b12f8ec2f3
pushed by
admin
main
2026-08-07 12:21:32 +02:00
14s
View workflow file
R-241 FIXED: registers, capability map, STATUS, hub CHANGELOG v0.98.0
gates #146
:
Commit
9657334fb7
pushed by
admin
main
2026-08-07 12:13:39 +02:00
18s
View workflow file
finalwalk teardown complete; R-244 filed; session report
gates #145
:
Commit
094e93e828
pushed by
admin
main
2026-08-07 09:59:50 +02:00
15s
View workflow file
R-239 CLOSED (golden 0.205.0 vouched); R-241 ruling into the map and STATUS
gates #144
:
Commit
db578cd44d
pushed by
admin
main
2026-08-07 09:27:55 +02:00
16s
View workflow file
golden 0.205.0 baked, published and round-trip verified — NOT vouched (R-239)
gates #143
:
Commit
08b75e602e
pushed by
admin
main
2026-08-07 09:06:29 +02:00
15s
View workflow file
SPIKE R-241 — ruled: a MINTING defect, not a screen-predicate defect
gates #142
:
Commit
71c43f87c2
pushed by
admin
main
2026-08-07 08:53:36 +02:00
6s
View workflow file
final walk COMPLETE — data PASS, journey FAIL; R-241 filed
gates #141
:
Commit
2228c0bff6
pushed by
admin
main
2026-08-07 06:46:08 +02:00
16s
View workflow file
final walk §7: the credential chain runs end to end, unaided, on an UNCLAIMED box
gates #140
:
Commit
1ff6f8f8e0
pushed by
admin
main
2026-08-07 05:23:30 +02:00
15s
View workflow file
First
Previous
...
43
44
45
46
47
...
Next
Last